Henry Hudson Bridge Milling & Paving Work Continues

Avatar
Published on September 18, 2020, 8:42 pm
FavoriteLoadingAdd to favorites 8 secs

To accommodate a roadway milling and paving operation at the Henry Hudson Bridge, the lower level southbound, to Manhattan, will be closed during the early morning hours on Tuesday, September 22, 2020. The southbound closure will start at 12:01 a.m. and go through to 05:00 a.m. The northbound upper level, to the Bronx, remains open as normal. 

Southbound traffic will be detoured onto Kappock Street at Exit 18, and motorists will follow detour via local streets to the Broadway Bridge. Motorists will then re-enter the southbound Henry Hudson Parkway at exit 17, Dyckman Street.

Motorists should allow for additional travel time.

When this work is complete, the roadway will have a smoother driving surface and freshly repainted lane markings.

Motorists can sign up for MTA e-mail or text alerts at mymtaalerts.com and for the latest information.

.

MTA
Avatar
Jonas Bronck is the pseudonym under which we publish and manage the content and operations of The Bronx Daily.™ | Bronx.com - the largest daily news publication in the borough of "the" Bronx with over 1.5 million annual readers. Publishing under the alias Jonas Bronck is our humble way of paying tribute to the person, whose name lives on in the name of our beloved borough.